Amending the lateral boundary of a designated river requires analysis and decision under the National Environmental Policy Act (NEPA). The environmental analysis process need not be complicated and may only require the proposed action and a no-action alternative. Amendment of a wild and scenic river boundary may also be timed with revision of the comprehensive river management plan and related decision under the NEPA. In either case, notice of the amended boundary should be published in the Federal Register and the legal description and maps forwarded to Congress and made...

The Wild & Scenic Rivers Act expressly prohibits the Federal Energy Regulatory Commission (FERC) from licensing the construction of a hydroelectric project or project works (e.g., facilities such as the powerhouse, access roads, transmission lines) under Part 1 of the Federal Power Act “on or directly affecting” a designated wild and scenic river. However, on the few rivers with a FERC-licensed hydroelectric project/project works within the river’s boundaries at the time of designation, existing operations may continue.

Relicensing of existing FERC-licensed hydroelectric...

Protective management of federal lands in the river area begins at the time the river segment(s) has been found eligible.  The free-flowing condition, identified outstandingly remarkable values, and classification are protected to the extent authorized under law and subject to valid existing rights.  Affording adequate protection requires sound resource management decisions based on National Environmental Policy Act (NEPA) analysis.  Protective management should be initiated by the administering agency as soon as eligibility is determined.  Specific management...

No. Where tribal lands are involved, sovereign tribes retain authority over the lands; however, the river-administering agencies seek opportunities to collaborate in protecting values of joint concern.

Yes. To withdraw a scenic or recreational river segment, the managing agency must submit a separate public land order or notice of realty action.

Yes. In some river study authorizations Congress has required the study agency to work with state and local governments and the public to develop a CRMP in concert with the study process to assist in determination of the river’s suitability. Such pre-designation CRMPs have, in some cases, been adopted in the legislation adding the river to the National Wild & Scenic Rivers System. In cases where Congress has not authorized a pre-designation CRMP, agencies have taken the initiative to develop elements of the CRMP in the study report (pre-designation).

The Wild & Scenic Rivers Act requires that detailed boundaries portrayed on maps be established and submitted to Congress within one year of designation. Agencies may finalize boundaries through their respective land management planning process.

Pending the establishment of detailed river boundaries, the Wild & Scenic Rivers Act specifies that the interim boundary is one-quarter mile on each side of the river as measured from the ordinary high water mark.

Section 3(b) of the Wild & Scenic Rivers Act states:

The agency charged with the...

Circumstances where agencies should always seek information and advice from each other are:

  1. In agency inventory and planning processes, and environmental analysis processes for aquatic ecosystems and regional watersheds; and,
  2. When proposed actions have the potential of affecting other agency-administered portions of the river.

Maintenance of roads generally would not be affected. In consultation with landowners involved through coordinated management planning, every effort would be made to eliminate or reduce adverse impacts from any proposals for road improvement, realignment and/or new construction. If a proposed new road would have a negative impact on river values, the administering agency will work with the landowner(s) to mitigate the proposal. Should mitigation and/or consultation fail to reduce adverse impacts to an acceptable level, the administering agency could negotiate with the landowner to purchase...

Camping is often important to the enjoyment of wild and scenic rivers. As appropriate, and when private interests do not provide sufficient facilities, the federal managing agency attempts to provide them on federal lands. As a condition of use, consistent with river classification and the management objectives for the river area, the managing agency may specify that camping will be permitted only in designated locations. Enforcement of camping restrictions and limitations can be through indirect means (brochures, maps, signs, etc.) and/or direct means (permits, enforcement personnel, etc...

Yes, the federal government may seek to control use on adjacent lands under very limited circumstances. The Constitution gives the federal government certain limited powers to control uses on state-owned lands that affect adjacent federal property. These powers may be exercised through the Property Clause, which provides that, “Congress shall have the power to make all needful rules and regulations respecting the territory or the property belonging to the United States.”

The federal government may also regulate use and/or activities occurring on the surface waters...

Timber management activities on federal lands outside the corridor are managed to protect and enhance the values that caused the river to be designated. Measures needed to protect and enhance the river’s values are developed through the river planning process and include management direction as necessary for lands adjacent to the corridor.

A primary objective of wild and scenic river designation is to protect and enhance riparian area function and other river-related natural values. Specific actions to meet the objective are typically set forth in the management plan required for each river.

Citizen stewards are increasingly important in protecting wild and scenic river values, often through river-specific or regional stewardship organizations. Individually, or through nonprofit entities, citizens help survey and monitor resource conditions, provide interpretive and education opportunities, contribute to restoration efforts, and support many other protection activities.

Any federally assisted construction project—by loan, grant, permit, license, or otherwise—which would affect the free-flowing condition of a wild and scenic river. This includes any hydroelectric project licensed by the Federal Energy Regulatory Commission (FERC)  under Part 1 of the Federal Power Act (36 CFR 297).


Review of hydroelectric and federally water resources projects under Section 7 of the Wild & Scenic Rivers Act is complex. Please refer to Wild & Scenic Rivers Act: Section 7 (2004), a technical...

In the Wild & Scenic Rivers Act, river values identified include scenic, recreational, geologic, fish and wildlife, historic, cultural, or other similar values. The Wild & Scenic Rivers Act does not further define outstandingly remarkable values. However, agency resource professionals have developed interpretive criteria for evaluating river values (unique, rare, or exemplary) based on professional judgment on a regional, physiographic, or geographic comparative basis. (Refer to The Wild & Scenic River Study Process (1999).)

Examples include, but are not limited to, bank stabilization/revetments; bridges (e.g., abutments, piers, approaches); emergency repairs; channelization; channel restoration; culverts; dams and dam removal; dredging or excavation; fish habitat/passage restoration or enhancement; gravel mining; in-channel transmission towers; levees; pipelines; recreation facilities such as boat ramps and fishing piers; water diversions/wells; and activities that are authorized under Section 404 of the Clean Water Act by the United States Army Corps of Engineers (ACOE).


Review of...

Wild and scenic river status does not provide federal authority to regulate private lands. The river-administering agency will cooperate with state and local agencies to appropriately monitor and evaluate activities on private land. If such activities (existing or potential) threaten or are incompatible with the values that contributed to the river’s designation, then, to the extent necessary, mitigation will be accomplished in cooperation with landowners and federal, state and local agencies.

Rivers designated under Section 3(a) of the Wild & Scenic Rivers Act, and most designated under Section 2(a)(ii), are classified in one of three categories depending on the extent of development and accessibility along each section. Designated river segments are classified and administered under one of the following, as defined in Section 2(b) of the Wild & Scenic Rivers Act:

...

Yes, a CRMP is developed in compliance with the NEPA. The purpose and need for the proposed action is to protect and enhance the values for which the river was designated (free-flowing condition, water quality, and outstandingly remarkable values), within its classification(s). The proposed action establishes appropriate goals, objectives, and/or desired conditions to meet those purposes. Alternative courses of actions are developed and analyzed relative to achieving overall goals and desired conditions within the wild and scenic river corridor. A “no action” alternative, representing the...

The federal government has rarely exercised its eminent domain powers with respect to wild and scenic rivers. Of the 226 rivers in the National Wild & Scenic Rivers System as of June 2022, condemnation for fee title has been used on only four rivers. Nearly all of the federal government’s use of condemnation occurred in the early years of the Wild & Scenic Rivers Act’s implementation when the attitudinal climate was one of federal acquisition. Similarly, the use of scenic easement condemnation has also been used very rarely, and then only on seven rivers, all designated prior to...

No. Under the Wild & Scenic Rivers Act, the federal government has no authority to regulate or zone private lands. Land use controls on private lands are solely a matter of state and local zoning. Although the Wild & Scenic Rivers Act includes provisions encouraging the protection of river values through state and local governmental land use planning, there are no binding provisions on local governments. In the absence of state or local river protection provisions, the federal government may seek to protect values by providing technical assistance, entering into agreements with...

Yes. There are four other principal agencies with authority on rivers, including wild and scenic rivers, in the United States. The EPA has authority to protect water quality; the Army Corps of Engineers (ACOE) has jurisdiction for water resources projects; the U.S. Coast Guard (USCG) has jurisdiction on inland navigable waters, vessel inspecting and licensing, safety and boating enforcement, aids to navigation, and permitting of bridges; and the Federal Energy Regulatory Commission (FERC) has authority to license the construction of hydroelectric projects.

The Wild & Scenic Rivers Act states that rivers designated under Section 2(a)(ii) “shall be administered by the State or political subdivision thereof without expense to the United States other than for administration and management of federally owned lands.” The state is responsible for providing protection, except on federally administered lands and with respect to Section 7(a) determinations and securing a federal reserved water right under Section 13(c), both of which are made by a federal agency. The National Park Service provides ongoing technical assistance and partnership...

Section 6(a)(1) of the Wild & Scenic Rivers Act states:

The Secretary of the Interior and the Secretary of Agriculture are each authorized to acquire lands and interests in land within the authorized boundaries of any component of the national wild and scenic rivers system designated in Section 3 of this act . . . but he shall not acquire fee title to an average of more than 100 acres per mile on both sides of the rivers.

The Wild & Scenic Rivers Act authorizes fee title acquisition to the equivalent of about a 400 foot wide strip of land...

Yes. Such projects may be constructed to protect and enhance fish and wildlife. In-channel structures (e.g., placement of large wood to replicate natural stream conditions) and in-channel activities (e.g., dredging to protect listed species) are acceptable, provided they do not have a direct and adverse effect on the values of the river (its free-flowing condition, water quality, and outstandingly remarkable values. Similarly, in-channel habitat projects may also be constructed below/above a designated river so long as they do not unreasonably diminish the scenic, recreational, and fish...

When Congress proposes a bill to designate an eligible river for which a suitability study has not been completed, the potential river-administering agency should endeavor to:

  1. Describe the resource and social factors typically evaluated in a study;
  2. Identify potential issues; and
  3. Assess its ability to manage the recommended component as a wild and scenic river.

This information provides the basis for the Administration’s decision to support or oppose the proposed designation.

As provided in Sections 4(a) and 5(c) of the Wild & Scenic Rivers Act, the following factors should be considered and, as appropriate, documented as a basis for the suitability determination for each river.

  1. Characteristics which do or do not make the area a worthy addition to the National Wild & Scenic Rivers System. These characteristics are described in the Wild & Scenic Rivers Act (see factors 2 through 7) and may include additional suitability factors (8 through 13).

  2. The current status of land ownership and use in the area.

  3. The...

Many individuals and communities support designation to help focus management efforts on protecting and enhancing river values. The intent of the Wild & Scenic Rivers Act is to build partnerships among landowners, river users, tribal nations and all levels of governments in developing goals for river protection. Designation provides strong protection against construction of new dams and projects that alter the free-flowing condition, water quality, and outstandingly remarkable values for which the river was designated.

Section 4(a) of the Wild & Scenic Rivers Act and the Interagency Guidelines describe and discuss content requirements, specific topics to be addressed, and the way in which information should be presented in such a study report. The National Environmental Policy Act (NEPA) process can, and is, readily merged with the requirements of the wild and scenic river study report. A wild and scenic river study report resulting from a decision in a land management plan usually summarizes and incorporates relevant information from the plan and associated NEPA document. For example, the location...

Once such a river has been found eligible, the federal study agency should, to the extent it is authorized under the Wild & Scenic Rivers Act and subject to valid existing rights, ensure the river and the surrounding area are protected as a potential wild and scenic river pending a suitability determination.

There are no known studies comparing river use levels before and after wild and scenic river designation with changes in use levels of similar non-wild and scenic rivers. Factors other than wild and scenic river designation (i.e., river and water attributes, access to the river, and availability of facilities and commercial services) are considered to be the major influences on river use levels. For wild and scenic rivers, as for other rivers managed by federal agencies, the implementation of permit systems or other limits of use are typically undertaken when use exceeds an acceptable...

It is important to develop and apply standardized criteria through a documented evaluation process that may include a screening for potential wild and scenic rivers. If there doubt, evaluate the river according to the criteria in the Wild & Scenic Rivers Act, i.e., free-flowing condition and outstandingly remarkable values.

(*For some rivers, Congress has directed the river-administering agency in Section 3(b) to determine which classes “best fit the river or its various segments.”  These administratively segmented rivers should reflect on-the-ground circumstances and, therefore, are unlikely to require subsequent amendment.)

Yes. In a very few cases, the legislation designating a river erroneously describes a segment division and needs to be amended to fit on-the-ground circumstances. For example, the designating language for the Upper Rogue Wild & Scenic River...

Yes. The Wild & Scenic Rivers Act directs other federal agencies to protect river values. It explicitly recognizes the regulatory roles of the Federal Energy Regulatory Commission and the Environmental Protection Agency in protecting wild and scenic rivers, and directs other federal departments and agencies that permit or assist in the construction of water resources projects to do likewise. The role of such federal agencies in water resources project construction may be through regulation, direct funding, or indirectly funding by providing federal assistance to others.

All...

No. The public’s right to float a particular river does not change with designation. Neither does designation give river users the right to use, occupy, or cross private property without permission.

Wild and scenic rivers may qualify as a Section 4(f) property, but designation of a river under the Wild & Scenic Rivers Act does not invoke Section 4(f) in the absence of significant Section 4(f) attributes and qualities. The Federal Highway Administration (FHWA), in consultation with the river-administering agency, determines on a case-by-case basis whether Section 4(f) applies. For example, Section 4(f) may apply to reaches of designated wild and scenic rivers that are publicly owned, open to the public and include recreation as a primary purpose, feature, attribute, or value....

No. Navigability determinations are based on factors other than wild and scenic river designation. Because of this, designation does not affect ownership of the submerged lands [or minerals lying] under the river.

A variety of methodologies are used to determine instream flows necessary to protect flow-dependent outstandingly remarkable values for a specific wild and scenic river. Methodologies can range from staff/expert opinions (e.g., flows necessary for boating) to complicated hydraulic models (e.g., Instream Flow Incremental Methodology and Physical Habitat Simulation Models) used to simulate fish habitat requirements.

 

Water law is a complex legal area, and water rights are a highly contentious issue. Whenever a water allocation issue arises, a river manager...

The Act (Public Law 90-542; 16 U.S.C. 1271-1287) was signed on October 2, 1968. It has been amended many times, primarily to designate additional rivers and authorize additional rivers for study for possible inclusion.

Yes. The Wild & Scenic Rivers Act anticipates the need for occasional adjustment of the lateral (river corridor) boundary, directing that such amendment follow the same process as described for the initial boundary development in Sections 3(b) and (c) of the Wild & Scenic Rivers Act. The legally established river corridor might require amendment to better reflect protection of outstandingly remarkable values or as the result of identification of a new outstandingly remarkable value.

Timber management activities on non-federal lands outside the corridor are guided by state and local authorities. The river manager may provide technical assistance and/or work with state/local governments to protect river values.

Yes.  The federal agency should consider a wide variety of internal and external sources from which to identify potentially eligible rivers.  These sources may include:  American Rivers’ “Outstanding Rivers List,” statewide river inventories/assessments, published guidebooks, etc.  The important point is to develop and apply standardized criteria through a documented evaluation process for potential wild and scenic rivers.

No. The Wild & Scenic Rivers Act specifically prohibits the federal government from expending funds on Section 2(a)(ii) rivers, except to manage federal lands or to provide technical assistance to local managers.

Benefits may include, but are not limited to, providing managers tools or mechanisms to protect free-flowing condition, i.e., protection of river values through the assessment of hydroelectric facilities or water resource development projects within the designated reach; protection and enhancement of water quality and outstandingly remarkable values; and, if a river’s management plan objective, promotion of economic development, tourism, or recreational use. Based on current limited studies, indications are that property values remain stable or increase on designated rivers. This is often...

The need to clarify the terminus should be identified as a management concern/public issue during the planning process and considered in establishment of the initial boundary. The proposed clarification associated with establishment of initial boundaries must be undertaken with full public input and disclosure and is often completed during development of the comprehensive river management plan (CRMP).

In rare instances where the agency did not define the terminus to fit on-the-ground practicalities (e.g., a terminus described in legislation as “from the dam” included a dam and dam-...

Due to the dams, diversions, and water resource development projects that occurred from the 1930’s to the 1960’s, the need for a national system of river protection was recognized by conservationists (notably Frank and John Craighead), congressional representatives (such as Frank Church and John Saylor), and federal agencies.  The Act was an outgrowth of the national conservation agenda of the 1950’s and 1960’s, captured in the 1962 recommendations of the Outdoor Recreation Resources Review Commission.  The Act concluded that selected rivers be preserved in a free-flowing...

Timber management activities on federal lands within wild and scenic river corridors must be designed to help achieve land-management objectives consistent with the protection and enhancement of the values that caused the river to be added to the National Wild & Scenic Rivers System. Management direction needed to protect and enhance the river’s values is developed through the river planning process. Wild and scenic river designation is not likely to significantly affect timber management activities beyond existing measures to protect riparian zones, wetlands, and other resource values...

The Department of Transportation (DOT), in coordination with the river-administering agency, performs compliance reviews for qualifying properties. While Section 4(f) requires that the river-administering agency’s recommendations for minimizing harm are considered during the planning process, the authority to administer and make Section 4(f) approvals ultimately resides with the DOT. The river-administering agency’s concurrence on any DOT Section 4(f) compliance documents should clearly state that its concurrence is contingent upon a favorable final determination for the project under...